Jump to content

Recommended Posts

Posted (edited)

Lycoming is issuing an AD for "ALL" engines manufactured between January 2009 and February 2017.  This is 16,000 effected engines.  Apparently there have been multiple reports of connecting rod failure that led to serious engine issues and in-flight shutdowns!

The AD will require regular oil inspections to check for bronze metal particles.  If particles are found further checks of the rod bushings for damage or wear will be required.  If found, parts must be replaced.  Yikes.  Hoping my engine (reman completed in 7/19 will NOT be imacted.

Edited by Echo
  • Echo changed the title to Lycoming Connecting Rod AD Coming in December!

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.