HRM Posted February 1, 2015 Report Posted February 1, 2015 I am selling my UBG-16 (Ultimate Bar Graph Engine Analyzer) that was removed when from my E when my MVP-50 was installed. These are sold on Spruce as well as direct by EI. This is a TSO part and you send it to EI who will check it out and then reset it to the parameters of your Mooney for a fee (used to be $125). This box is EXTREMELY well-documented on the web, you can download it all and read--operating, installation, etc. Call EI and chat, they are super to work with. Photos are on Flickr here. UBG-16-8 • S/N055326 FM-GYRO Module (Vacuum Pressure) FM-RPM module (RPM) FM-OP module (oil pressure) MUX-8A module ("Black Box" data recorder to DL data to PC or upload to "Savvyanalysis") EGT/CHT sensors not included—I kept the originals for the MVP-50, this way you get all new $1,500.00 (1.5 AMU) Quote
Piloto Posted February 1, 2015 Report Posted February 1, 2015 Works great!. I have one in my M20J and love it. José Quote
Wakeup Posted February 2, 2015 Report Posted February 2, 2015 Love to have one but that's almost what they are selling for new. Quote
HRM Posted February 2, 2015 Author Report Posted February 2, 2015 Just looked. $1648 new. Looked where? Guys, add the four modules...jeez. Quote
Marauder Posted February 2, 2015 Report Posted February 2, 2015 Looked where? Guys, add the four modules...jeez. Tough crowd. The 4 modules will bring the total new price to: $2489.80 plus you get new EGT/CHT probes... Quote
Amelia Posted February 2, 2015 Report Posted February 2, 2015 I have an EI UBG-16, too. It's for a 6-cylinder engine, yellow-tagged. Wiring harness is included. No probes are included, but all the computer stuff and instruction books are. I would be delighted to get $500 for it. Quote
Piloto Posted February 3, 2015 Report Posted February 3, 2015 HRM You may want to consider the option of selling the UBG-16 without the modules. José Quote
HRM Posted February 3, 2015 Author Report Posted February 3, 2015 HRM You may want to consider the option of selling the UBG-16 without the modules. José I am open to all offers. Quote
furledd Posted February 4, 2015 Report Posted February 4, 2015 I have that same EI setup as you did and curious how much did it cost to get an MVP-50 installed by the time you were all done I had been toying with the idea but figured it would be well over $5k ...maybe $10k by the time all those gauges were replaced... Posible to share your experience on that? Quote
HRM Posted February 4, 2015 Author Report Posted February 4, 2015 I have that same EI setup as you did and curious how much did it cost to get an MVP-50 installed by the time you were all done I had been toying with the idea but figured it would be well over $5k ...maybe $10k by the time all those gauges were replaced... Posible to share your experience on that? PM sent. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.