Search the Community
Showing results for tags 'hangar construction'.
-
I am in the process of building two large buildings which will be divided into a total of 10 hangars here in central Florida on a public use airport that participates in the AIP program. I have signed my lease and am currently waiting for my lease to be ratified by the full city commission but I am trying to get a jump on the administrative process.A lot has changed with the FAA requirements since I built my last hangar in the mid 90’s. I don’t need help with site engineering or submitting anything to the city nor do I need help with site prep, construction or permitting. What I do need help with and would like to hire someone knowledgeable to perform is to prepare me a list of everything that I need to submit to the FAA for approval as well as a review of my existing site utilization plan to confirm that my set backs and the height of my hangars are in compliance. I also need someone that is familiar with filling out and submitting FAA Form 7460-1. I also understand that there is a new requirement which began in January 2020 for an environmental assessment or possibly a categoric exclusion from the environmental assessment. I want to get this FAA process right the first time and not do a learn as I go application process. I have reached out to two different aviation consulting firms with little success. They want the entire package including the engineering and applying for the city permits etc. or they don’t want to be involved at all. Being a licensed FL GC and mechanical contractor we have a great in house engineer as well as two in house permit technicians, so we don’t need any help on that end. If anyone is familiar with this process and can tell me exactly what forms are needed and what all is involved in getting the FAA approval And would be willing to consult with my company for a reasonable fee I would like to hear back from you. I am also very open to paying someone to fill out the required FAA documents and I guess walk me through this process from the beginning to the end. I have heard from the two different consultants that this takes anywhere from 30 to 45 days with the FAA. I would like for this to coincide with my plans review with the city if at all possible. I am NOT looking for anyone to do this for free. I am not a CSOB and am willing to pay a fair price for this service. If you have the knowledge and experience needed to provide what I need and are willing to help, please shoot me a PM. If you know of someone else that has this knowledge and would be willing to help me out then please PM me with their information. I have always found this forum to be very helpful and suspect that there may very well be members of this forum who have the info that I am looking for or can at least steer me in the right direction. Thanks in advance for any assistance. Frank
- 16 replies